Execution recommendation

This file defines how the agent chooses between inline execution and subagent-driven execution after producing a completed plan through superpowers:writing-plans. It is referenced by the planner-brief templates and overrides any static upstream recommendation.

Inputs

Evaluate the completed plan using only information already present in it:

Do not ask the user to classify the plan when these signals are already present in the plan text.

Decision matrix

Factor Favors inline Favors subagents
Task count 1–2 top-level tasks 3 or more top-level tasks
Independence Tasks are sequential, share the same files, or require outputs from previous tasks Tasks can be implemented and verified independently without shared intermediate state
Complexity / risk Mechanical edits, straightforward wiring, localized refactors, or low-risk documentation/script work Cross-cutting behavior, multiple subsystems, design judgment, or meaningful regression risk that benefits from review gates

Decision rule

  1. Evaluate all three factors against the completed plan.
  2. Assign each factor to either inline or subagents.
  3. If two or more factors favor inline, recommend inline execution.
  4. Otherwise recommend subagent-driven execution.
  5. If any factor is genuinely unclear from the plan, classify that factor as subagents rather than asking the user. The fallback bias is safety, not optimism.

Example: 3 sequential mechanical tasks still route to inline because independence and complexity both favor inline (2 of 3 factors).

Output contract

Emit exactly one sentence that:

Examples:

Immediately after the sentence:

Do not:

Failure fallback